Before choosing a location, check where the grid has available capacity

Available-capacity lists from PSE, PGE, Tauron, Enea, Energa and Stoen on one map: 590 substations with reported capacity for generators and over 2,000 entries in application lists. Compare reported capacity with application pressure before spending money on land.

Find reported capacityEnter a parcel address to see the nearest primary substations (GPZ) and values published by operators.
Compare substationsBy voltage (110/220/400 kV), operator and voivodeship.
Check application pressureCompare entry counts and the total capacity of applications, with sources and dates beside the data.

This tool looks at substations. If you want to start from a specific piece of land, check a land parcel for RES: for the selected location we will show the nearest substation's available capacity, the application queue, forms of nature protection, the local spatial development plan and flood risk.

Freemap and lists from six operators, application pressure, no account required
Full accessfull values and the queue for every substation, without maskingPLN 19 excluding VAT/month for 3 monthsGet started what is included
Available capacity for: I am planning:
Your saved substations →
View:
Nearest primary substations (GPZ) to a parcel / address Radius: 25 km Minimum indicative difference (MW) We convert the address you enter into a point on the map. We send only the address text, without your IP address or account data.
Data source status: 6 operators, publication date and link

Every number on the map comes from a grid operator's publication required by Article 7(8l) of the Energy Law. The table below shows the publication date used for the Available capacity layer and a link to the operator's source.

Operator publications used in the Available capacity layer
OperatorSource publication dateSource
Enea Operatorsource, Enea Operator
Energa-Operatorsource, Energa-Operator
PGE Dystrybucjasource, PGE Dystrybucja
PSEsource, PSE
Stoen Operatorsource, Stoen Operator · document, Stoen Operator
TAURON Dystrybucjasource, TAURON Dystrybucja · document, TAURON Dystrybucja

We read dates and links from the same data file used to draw the map, so they change together with the data. Each operator updates its list on a different schedule, at least quarterly, which is why dates differ. The table date is the date for which the operator's list applies; where an operator does not provide that date, it is the date the publication was retrieved. If the data contain no date, the column shows ‘according to the operator's publication’. Binding data must be confirmed by the relevant DSO/TSO.

What Full access changes

The same operator lists. A different way of working.

Without Full access

Read public capacity and application lists with publication dates.

Compare publications from six operators, each with a different as-of date and data scope.

Reassemble spreadsheets whenever a list is updated.

With Full access

Open the location analysis in Check a land parcel for renewable energy.

Application pressure within 20 km also includes other operators. It is not the complete queue for that substation.

Check the available data scope and limitations beside the location result.

Full accesslocation and application-pressure analysis · data scope explained beside the result
included in the subscription
Application in the queueCapacityStatusDate
PV plant, Nieporęt municipality12.5 MWin progress05.2026
Energy storage, Serock municipality40.0 MWplanned04.2026
Wind farm, legionowski county28.0 MWin progress03.2026
PV+BESS hybrid, Wieliszew municipality17.3 MWplanned02.2026
Illustrative table, example data · does not represent an actual substation queue or change history
Application data varies in scope and location accuracy. Geographic proximity does not establish connection to a particular substation.
The oldest date in the layer metadata is 01.04.2026.
Connection passport · calculated for your location
Advance payment60 PLN/kWcalculated for your capacity
Security30-60 PLN/kWplus the connection conditions application fee and maximum advance payment
Statutory deadlineProvide security within 14 days of concluding the connection agreement, failing which the agreement expires (Article 7(8c9) of the Polish Energy Law).
Full valuescapacity and application data within the scope available for the location
Every company by NIPyour counterparty's licences, MIOZE entries and VAT status
Your locationsthose you have and those you are considering
The full version of this view with Full access: PLN 19 excluding VAT/month for the first 3 months (PLN 23.37 including VAT), then PLN 199 excluding VAT/month (PLN 244.77 including VAT).
Renews automatically each month; cancel at any time. Your project and land listings are included at the same price, with no limit on the number of listings.
Start for PLN 19 excluding VAT/month See both options, including listing unlocks →
The map, public data and indicative Connection passport calculator remain free.
Fixed price, no negotiation.