Available grid connection capacity in Poland

Public data from PSE, PGE, Tauron, Energa, Enea and Stoen in one place, with a map, voivodeship tables and direct links to operators’ publications. Each operator assigns its own date to its list, and we collect those dates from operators’ publications.

Free report · quarterly update · next edition: October 2026 Author: EFET Foundation

Data provenance, scope and currency

The report aggregates grid operators’ publications and calculates totals for Poland and the voivodeships. It does not predict the outcome of a grid connection application. Before making an investment decision, check the current publication of the relevant operator and obtain connection conditions.

CompilationEFET Foundation
Aggregation date
ScopePSE and five distribution system operators (DSOs), capacity for generators and separately for consumers
Direct source publications
Dataset update history

31.08.2026: the aggregation was refreshed using operators’ source files. Individual publications may have different dataset dates, which are shown in the operator table.

Method: normalisation of substation and unit names, separation of capacity for generators and consumers, assignment of locations, and aggregation of records. Zeros and missing values remain distinct values. The “Methodology and sources” section describes the limitations in detail.

The source of each data set and the terms on which it may be re-used are described on the page Sources and terms.

Where in Poland is connection capacity available?

The operators report MW of available generation connection capacity in the distribution networks of five DSOs. Separately, PSE reports MW in the transmission network. We do not add these figures together. The data covers substations and points across six operators. Among DSO records with an identified voivodeship, the largest total available capacity for generators is in ( MW). Records without an identified voivodeship: DSO records with a total capacity of MW.

Available capacity for generators · distribution grids of five DSOs
MW
records per substation or group of substations, entries
PSE transmission grid (220/400 kV)
MW
points; presented separately from distribution
Substations and points with data for generators
and capacity records for consumers
Operators
PSE + 5 DSOs, all major operators
How to read these figures before comparing locations: 1. This is capacity reported in the operator’s publication: a snapshot on the publication date, reduced by issued connection conditions. It indicates where to begin checking, not a promise that a specific project will be connected. 2. Every figure has the operator publication’s date and source ; publication methodologies differ between operators and are described in the tool’s “About the data” section. 3. The application queue at a particular substation is one source for analysing your project. It does not confirm available capacity; the operator assesses this through the connection procedure: you can open the substation profile with its queue free of charge here; Full access provides complete queue values with a source beside every figure.

Capacity for generators (the ability to connect generators) and capacity for consumers (the ability to connect demand) are different quantities, so we do not add them together. In this dataset, Enea Operator and Energa-Operator publish capacity for consumers: a total of MW in records (substations and county aggregates).

Map of available capacity for generators

Loading map…

Planning a project in a specific location? The TransakcjeOZE.pl tool shows nearby primary substations (GPZ) with available capacity, the application queue, and filters by operator and voltage. Check your location on the map →

How much available capacity is there in each voivodeship?

Available capacity for generators in the distribution grids of five DSOs (values per primary substation, GPZ), by voivodeship, descending by total MW.
VoivodeshipSubstationsTotal capacity for generators [MW]Substation with the highest capacity
Loading data…

The table covers the distribution grids of five DSOs. Capacity in the PSE transmission grid is presented separately in the operator table. Low totals in eastern voivodeships are largely due to PGE Dystrybucja’s cautious publication method (low values reported for groups of substations), not an absence of grid infrastructure in those areas. Some operator lists do not specify a voivodeship. We assign only substations with a confirmed location to voivodeships (matched to an actual substation or manually verified); substations with only an approximate location (name geocoding) are shown transparently in the “approximate location, unassigned” row instead of being assigned to a voivodeship without sufficient basis.

How does each operator publish its data?

What each operator publishes and the date of its list. We present capacity for generators and consumers separately.
OperatorSubstations (generators)Capacity for generators [MW]Capacity for consumers [MW]List datedSource
Loading data…

PSE publishes data for the extra-high-voltage transmission grid (220/400 kV), while the other operators publish data for their distribution grids; the voltage level in publications differs between operators (details in the methodology). A dash means that the operator does not publish the quantity in the list used. “Declared for” means that the operator labels the list with a future date. Enea Operator updates its lists daily, so values on the operator’s website may differ from the values as at the retrieval date.

Available capacity against the application queue and refusals to issue connection conditions

Loading contextual data…

Do you have a project or land in a location with available capacity? Investors publish buyer requests on TransakcjeOZE.pl describing the projects, technologies and locations they seek. See what investors are looking for →

How to cite the report

Citation format: Source: Fundacja EFET / TransakcjeOZE.pl, “Available Connection Capacity in Poland” Report, July 2026. The report is available online only and updated quarterly.

For media and analysts: the methodology and direct links to operators’ publications are provided below. Send questions about the data, methodology or use of charts to biuro@fundacjaefet.pl. Before reporting a result, also read the guide on how to interpret available capacity and the connection queue.

Where the data comes from and how we calculate it

Meaning of “available connection capacity”. This is the capacity value published by the operator that, in its assessment, can still be connected at a given electrical substation or group of substations. The value is reduced by capacity covered by issued and valid connection conditions. It does not determine whether a specific project will receive connection conditions. That requires a separate application and operator assessment.

Legal basis for publication. Distribution system operators and the transmission system operator publish information on available connection capacity pursuant to Article 7(8l) of the Energy Law and update it at least quarterly. The report aggregates these public lists into one dataset.

Methodological differences between operators. Each operator publishes its list in its own format: granularity (individual primary substation (GPZ), group of substations, area), publication form (web table, file, interactive report), scope (some operators publish capacity for generators only), and dataset dates differ. The voltage level also differs: according to source notes, Enea Operator publishes values for the medium-voltage (SN) grid per primary substation (GPZ), Stoen Operator for the 110 kV grid, and PSE for the 220/400 kV transmission grid; the source list below provides operator-specific details. Some operators (e.g. TAURON and PGE) provide values for groups of substations, in which case one dataset entry represents several physical primary substations (GPZ). We present values without conversion, so comparisons between operators should be treated as indicative. Some substation locations are approximate (automatic geocoding).

  • Loading source list…
Sources, licences and disclaimers

Voivodeship boundaries: polska-geojson, © 2019 Piotr Patrzyk (MIT licence); source boundary data: GUGiK (PRG). Basemap and map data: © OpenStreetMap contributors (ODbL licence). Energy Regulatory Office (URE) data is used in excerpts (aggregate figures from the President of the Energy Regulatory Office (URE)’s 2025 Report), in processed form; retrieved 11.07.2026. Informational material. It does not replace examination of connection conditions or legal analysis.

Frequently asked questions about available connection capacity

Where in Poland is the greatest amount of available connection capacity?

According to operators’ current publications, the highest total available capacity for generators in the distribution grid among records with an identified voivodeship is in ( MW). The table above ranks assigned records and lists records without an identified voivodeship separately. The ranking does not establish which voivodeship would have the most capacity if all missing assignments were resolved.

What does “available connection capacity” mean?

This is the capacity that, according to the grid operator’s publication, can still be connected at a given substation or group of substations. It is reduced by capacity covered by issued and valid connection conditions. It does not determine whether a specific project will receive connection conditions. That requires a separate application and operator assessment.

How does data from distribution system operators (DSOs) differ from PSE data?

Five distribution operators (PGE, TAURON, Energa, Enea and Stoen) publish capacity for their distribution grids, to which most renewable energy projects connect; the voltage level in publications differs between operators (for example, Enea reports values for the medium-voltage (SN) grid per primary substation (GPZ), while Stoen reports values for the 110 kV grid). PSE publishes capacity for the 220 and 400 kV extra-high-voltage transmission grid, which is relevant to the largest installations. The report presents these values separately and does not add them together.

How often is the report updated?

We update the report quarterly, in line with operators’ publication cycles. Operators have a statutory duty to update the lists at least quarterly (Article 7(8l) of the Energy Law). We provide the dataset date and source for every value.

Why do we not add capacity for generators and consumers into one figure?

Capacity for generators describes the ability to connect generation (e.g. solar PV and wind farms), while capacity for consumers describes the ability to connect demand (e.g. industrial plants). These are two different quantities and adding them together has no technical meaning, so the report presents them separately.

Does the report also cover energy storage?

The lists published by operators concern available connection capacity for generators. Energy storage and hybrid-project investors use them as a reference when selecting locations because storage that exports energy to the grid competes for the same grid capacity as generating sources. The operator specifies the connection rules for a specific storage facility in the connection conditions, and the report does not replace that verification.

May I cite data from the report?

Yes. The report is free and may be cited using: “Source: Fundacja EFET / TransakcjeOZE.pl, Available Connection Capacity in Poland Report, July 2026”. The source data comes from grid operators’ publications under Article 7(8l) of the Energy Law.