TransakcjeOZE.pl
PL
TransakcjeOZE.plSell › Renewable energy in dębicki County: sale of projects and land

Renewable energy in dębicki County: sale of projects and land*

According to the Energy Regulatory Office register, dębicki County (podkarpackie Voivodeship) has 26 renewable energy installations with a total capacity of 27.1 MW (as at 31 March 2026). The predominant installations are photovoltaic. This is an active local market: owners of projects and land in this county can find buyers and lessees from across Poland on TransakcjeOZE.pl.

26renewable energy installations (URE)
27.1 MWinstalled capacity
10.0 MWlargest installation
22photovoltaic installations

The municipalities with the highest capacity are: Czarna – rural municipality (10.0 MW), Żyraków – rural municipality (4.9 MW), Dębica – urban municipality (3.5 MW), Dębica – rural municipality (2.0 MW).

Renewable energy data in the county: source and structure

Data source: Energy Regulatory Office, “Renewable energy source installations, as at 31 March 2026”URE published the file on 25 May 2026.

Installations and capacity by technology in dębicki County
TechnologyNumber of installationsTotal capacity (MW)Share of capacity
Photovoltaics2226.096.1%
Hydropower30.93.2%
Biogas10.20.7%

Method: TransakcjeOZE groups source records by the county field. The number of installations corresponds to the number of records assigned to the county, while total capacity is the sum of the installed-capacity field. Each technology’s share is calculated against the county’s total capacity.

The data describe existing installations. They do not show available connection capacity and do not determine whether a new project is feasible. Check grid availability separately using Check available connection capacityCheck a specific property by location: Check a land parcel in this county →

Are you selling a project or land in dębicki County?

Publish a moderated listing with a teaser that contains no sensitive data. An entitled buyer receives the full details and contact information in accordance with the Platform rules. Current fees are set out in the Price Listand dated reference data in the TransakcjeOZE Index.

Add a projectList landBrowse listings

Frequently asked questions

Is it viable to build further renewable energy installations in dębicki County?

The URE register lists 26 operating installations here with a capacity of 27.1 MW. The register data alone do not determine whether a new project is feasible. Check the sources and entry cost using Calculate connection fees.

How is a listing published?

After the form is submitted, the Operator reviews the listing before publication. The listing becomes visible after moderation approval.

Sell a project: podkarpackieLand: podkarpackieProjects for sale: podkarpackieAll regions

* We compile the profile from public registers and listings published on the platform. We publish personal data to the extent disclosed by the source dataset. Objections to publication may be sent to biuro@fundacjaefet.pl.